UPDATES OF MANUALS

UPDATES OF MANUALS AND CORRECTIONS

Click to see
Engineering Code - Advance Correction Slips

1.

INDEX OF ADVANCE CORRECTION SLIPS OF INDIAN RAILWAYS PERMANENT WAY MANUAL (IRPWM) - 1986

ACS
No.
Para(s) affected File No. Date of AC slip

Brief subject.

1. 909   18.9.89

Traffic & Engineering gates

2. 275   08.6.90

Provision of Guard Rails on Bridges

3. 238 No.90/CE-II / MT-TS/4 16.4.90

Deep screening of Ballast.

4. Para.1.2,1.6 at page 1 of Ann.M/2 and para 4.2.1 at page 5 & para 5.6.3 at page 9 of Ann. M/2 No.91/CE-II/Misc./ 6
No.91/CE-
II/Misc./ 6
02.8.91&
22.7.93

1.2 Length of CWR
1.6 Removal of Buffar Rails
4.2.1 LWR /CWR
5.6.3 SEJ or Buffer Rails

5. LWR No.CT/ IM / LWR issued from RDSO,LKO 12.9.91

-do-

6. 115 & 124(d) No.91/CE-II/Misc./ 6
Routine Inspection of Track
23.12.92

Inspection of office and Stores

7. 259 No.91/CE-II/Misc./ 6 28.8.94

Combination of Fish Plates.

8. 410(2) No.91/CE-II/Misc./ 6 28.8.94

Speed over Turnout curves.

9. 124 &
139
No.93/CE-II/TSC / 1 14.3.92

Inspection of Track
Inspection of Track

10. 224

316

403
94 /CE-II/TSC / 1 20.6.96

224 Regular Track Maintenance.
316 Track laying standards.
403 Gauge on Track

11. 914(b) (i) No.94/CE-II/TSC / 1 21.8.96

Maintenance of level crossing

12. 410(2) No.91/CE-II/Misc./ 6 08.10.96

Speed over Turnout curves.

13. 910 No.97 /CE-II/PRA /3 01.7.97

Euipment of level crossing

14. 804 No.98 /CE-II/PRA /7 03.6.98

Precautions before commencing operations which would obstruct the line.

15. 283(2) (c) No.97 /CE-II/TK /8 01.7.98

Special instructios to staff working in Traction area.

16. 1122 No.98/CE-II/TK/2 /Pt. 08.9.98

Rail Dolleys.

17. 1227 No.98 /CE-II/PRA / 23/CRS. 08.9.98

Working of Track Maintenance
Machine.

18. 275(2) No.98 /CE-II/CS /2 08.12.98

Guard Rails on Bridges.

19. 618 No.91/Track-III/TM/26
Vol.II (Pt.)
18.11.98

Portable Accelerometers.

20. 237

317
No.96 /CE-II/PRA / 26/CRS 16.11.98

237 Inspection and Maintenance of points Xing.
317 Renewal of points & Xings.

21. 202(1) No.98 /CE-II/TS /3 11.12.98

Classification of Lines.

22. 238(1)(b) No.98 /CE-II/CS /2 27.1.99

Deep screening of Ballast.

23. 211(ii) No.98 /CE-II/PRA / 16(CRS) 10.3.99

P.Way plans and Diagrams.

24. 302(d) No.98 /CE-II/CS /2 22.4.99

Fcators Governing P.Way Renewals.

25. 244(4)(a)
248(2)

305(2)(a)
No.98/CE-II/TK/Misc./2 25.5.99

244 Laying of sleepers
248 Standard sections of Rails.
305 Track Standard for Renewals.

26. 1408

1411
No.98/CE-II/TK/Misc./3 04.4.99

1408 Maintenance of concrete Sleepers.
1411 Maintenance of concrete sleepers Fastening.

27. 808(3) No.94/CE-II/TK/6 18.6.99

Temp. Engg. Fixed signals Locations and details.

28. 252(3) No.Track/21/99/0907/7 07.9.99

Inspection of Rails in Service.

29. 618 No.91/Track-III/TM/26
Vol.II (Pt.)
07.7.99

Portable accelerometers.

30. 202(1) No.98 /CE-II/TS /1 Pt. 07.7.99

Classification of Lines.

31. 261
262
263(2)(a)
No.98/CE-II/TK/Misc./2 26.7.99

261 Type of Ballast in use.
262 Size of the Ballast.
263 Ballast profiles/Sections /Depth of cushions.

32. 320(1)(a) No.98 /CE-II/CS /2 04.8.99

Classification,use of released material.

33. 922


923
No. 98/CE-I/ LX /80 06.8.99

922 Manning of unmanned level crossings
923 Level crossing on National High Ways.

34. 252(3)

502(4)
No. Track / 21/ 99 / 0907 / 7 06.8.99

252 Inspection of Rails in service.
923 Level crossing on National High Ways.

35. 901
910(4)(c)

919(2) & (5)


924

925
  19.8.99

901 General Location.
910 Equipment at level crossing.
919 Census of Traffic at level xing unmanned/manned.
924 Provision of New level xings.
925 Criteria for replacement of existing level xings.

36. 502

127

No. Track / 21/99 / 0907/7 24.8.99

502 Alumino Thermit welding of Rails.
127 Quality of welding and avoidable fractures.

37. 807(2)(b) No.98 /CE-II/CS /2 01.9.99

807 Works of long duration.
808 Temporary Engg. Fixed signals.

38. 281(c) No. Track /21/99/0907/7 08.9.99

Glued insulated Joints.

39. 244(4)(a)
248(2)(a)

305(2)
No.97 /CE-II/TS /2Pt.2 22.9.99

244 Lying of sleepers.
248 Standard section of Rails.
305 Track Standard for Renewals.

40. 913(3)(a&b) No.96 /CE-II/TK /12 27.9.99

Duties of Gateman.

41. 302(a) No.98 /CE-II/CS /2pt. 02.11.99

Factors governing P.way Renewals.

42. 301

1411(4)
No.98 /CE-II/CS /2 05.11.99

301 Classification of Renewals.
1411 Maintenance of concrete sleeper fastening.

43. 257(4)(d) No. Track / 21/ 99 / 0907 / 7 07.1.2000

257 Rails failures.
704 Action at site.

44. 919 No. 99/CE-I/ LX /80 10.2.2000

Census of traffic at level crossings.

45. 607 No.94/Track-III/TK/23
Vol.II
17.2.2000

Tracks categories for various parameters.

46. 202(2)(a) No.98 /CE-II/TS /1 Pt. 06.3.2000

Classification of lines.

47. 243(4) No.99 /CE-II/PRA / Accd./1 15.3.2000

Buckling of Track.

48. 1208 No.93 /CE-II/PRA / 40 11.4.2000

Official incharge of Material Training.

49. 263 No.97/CE-II/Misc./ 5(CS) Pt. 11.4.2000

Ballast profiles/ section,Depth of cusion.

50. 918 No. 99/CE-I/ LX /80 13.4.2000

Provision of speed brakers on the approaches of unmanned L. xing.

51. 251(5) No.98 /CE-II/CS /2 21.4.2000

Maintenance of Rail Joints.

52. 211 No.98 /CE-II/TS /4 24.2.2000

P.Way Plans and Diagrams.

53. 203(1)

205
225

228
No.88/Track-III/TK/18/
Vol.III Pt.
24.4.2000

203 System of Track maintenance .
205 Maintenance planning.
225 Maintenance by measured showel packing.
228 Directed Track maintenance.

54. 277 No.99 /CE-II/TK /20 29.5.2000

Inspection and maintenance of track on approaches of bridges.

55. 910(1)(y)&1007(1) No.98 /CE-II/CS /2 31.5.2000

Equipment at Level crossing procedure for manual laying.

56. 252(3) No. Track / 21/99 / 0907/3 13.7.2000

Ultrasonic Rail flaw detector.

57. 202(1) No.98 /CE-II/CS /2 31.5.2000

Classification of Lines(BG).

58. 167

168

169
170
No.97 /CE-II/TK /15 31.7.2000

167 Selection and training of keymen.
168 Keyman's daily inspection.
169 Equipment of keyman.
170 Duties of keymen.

59. 275(3) No.2000/CE-I/Misc./10
(IRPWM)
1.8.2000

275 Provision of Guard Rails on Bridges.
723 Pre-monsoon precautionary measures.
724 Material for Emergency.

60. 237(1)L


242(3)C
No.98 /CE-II/CS /1 7.8.2000

237 - Inspection & maintenance of Pts & crossing.
242-Creep.

61. 248(2)(a&b)

305(2)
No.97 /CE-II/TS /2 Pt.2 22.8.2000

248-Standard section of Rails.
305-Track standard of renewals.

62. 1405

1413
No.98 /CE-II/CS /2 13.9.2000

1405 Laying of concrete sleepers.
1413 Laying of Fan shaped turnout sleepers.

63. 275(3) No.98 /CE-II/CS /1 27.11.2000

275 Fixing of Guard Rails on concrete sleepers.

64. 901 No. 99/CE-I/ LX /80 05.1.2001

Level Crossing gateman-901 General location.

65 309 No.99/CE-II/TK/Misc. 01.03.2001

Project Report for track renewal works.

66. 914 No.2000 /CE-II/PRA /6 30.3.3001

Regarding removal and replacement of check rails of level crossing during tamping.

67. 1408 No.98/CE-II/TK/Misc./3 24.4.2001 Maintenance of concrete sleeper.
68. 206 No.98/CE-II/TS/4 25.4.2001 Recording of Gang work - Ann.2/3.
69. 826 No.99/CE-II/PRA/32 23.5.2001 Safe working of contractors.
70. 204 Note (1)

245(e)

301(1)


301(3)

301(4)
No.98/CE-II/CS/2 24.5.2001

204 Annual Prog. Of Track Maintenance.
245(e) Wooden Sleepers.
301(1) Classification of Renewals.
301(3) Scattered Renewal.
301(4) Casual Renewal.

71. 283(2)(C) No.97 /CE-II/TK /8 17.7.2001 No part of a tree shall be nearer than 4 metres from the nearest live conductor.
72. 1411(5)b No.98/CE-II/Tk/Min/3 08.08.2001 In Service Maintenance.
73. 1411(5)b No.98/CE-II/Tk/Min/3 02.11.2001 Greasing of ERC.
74. 277 No.99/CE-II/TK/20 26.11.2011 Sleepers and Guard Rails on Bridges.
75 913(a)
913(b)
No.96/CE-II/TK/12 05.03.2002  
76 410 (3)
410 (4)
No. 2001/CE-II/TK/4 16.05.2002 Speedover interlocked turn-outs.
77 248 & 322 Track/21/93/0503/7 12.8.2002 Track structure for different categories of track.
78 1408 98/Track-III/TK/17/Vol.II 9.9.2002 Picking up of slacks.
79 283 (2)© 97/CE.II/TK/8 10.10.2002 The modalities to be adopted for cutting/trimming of the trees.
80 264 98/CE-II/CS/2 2.12.02 Quantities of ballast required to recoup the deficiencies.
81 914 2002/CE-II/PRA/7 3.12.02 Check rails of level crossings
82
1122(4) (iii) 98/CE-II/TK/2 Pt. Dated 2.2003 2.2003 Protection of rail dolley by a flagman
83
606 91/Track-III/TM/26/ Vol.III,, dt.25.2.03 25.02.2003 Frequency of Track Recording
84
170 & 1411 98/CE-II/TK/MISC/3, dated 8.5.2003 8.5.2003 Duties of Keyman
85
256(1) 2002/CE-II/PRA/9 Pt.(CRS) dated13.5.03 13.5.03 Permanent closure rails in running lines
86 507(1) 98/CE-II/TK/MISC/3, dated 7.7.2003 7.7.2003 Alignment - SWR shall not be laid oncurves sharper than 50 meters.
87 170 98/CE-II/TK/MISC/3, dated 25.7.2003 25.7.2003 Keyman also to ensure greasing of the ERC.
88 259(2) 99/CE-II/TK/MISC/3, dated 15.9.2003 15.9.2003 Rail maintenance toreduce Rail Deteioration.
89 211(1)(v) 98/CE-II/TK/CS/2,  dated 19.9.2003 19.9.2003 Permanent Way Track Diagram
90 421 2003/CE-II-CS-1 23.12.2003 Criteria for realignment of a curve
91 252(3) Track/21/99/0907/7 20.01.2004 Ultrasonic testing of rails
92 302(I)(e) 2003/CE-II/CS-1 04.02.2004 Rail renewal on the bridge
93 320(3)(5)(8) 98/CE-II/CS2 05.03.2004 Corrections in advance correction slip nos. 32, 44 & 70
94 410(3) & 410(4) 01.06.2004 Speed over interlocked turnouts
95 410 2003/CE-II/PRA/17(CRS) 20.06.2004 Methodology to be adopted by contractors
96 607(2) & (3) 2003/CE-II/PRA/17(CRS) 22.07.2004 Ammendments to Para 607(2) & (3)
97 Para 807 & 808 2004/CE-II/CS/1 19.10.2004 Ammendments to Annexure 8/3 (Para 807 & 808)
98 Para 202 2004/CE-II/CS/1 17.05.2005 Classification of Lines.
99 Para 107, 502, 125, 209 2004/CE-II/CS/1 12.2005 Amendments to para Nos. 107, 212, 502, 125, 209
100 Para 902 2003/CE-I/LX/59/ 21.06.2006 Classification of Level Crossings.
101 Para 107 2004/CE-II/CS/1 12.2006 Inspection by Trolley.
102
with
Corri-gendum
Para 244(2)(e), 273(1), 275(3), 276, 506(3),716 (2) and 1404 No. 2006/CE-II/CS/1 30.05.2007 Advance Correction Slip No.102  to the Indian Railways Permanent Way Manual.
103 Para 237(6) No. 2007/CE-II/CS/2 01.06.2007 Advance Correction Slip No.103  to the Indian Railways Permanent Way Manual.

104

1504 No.2007/CE-II/CS/2 19.07.2007 Advance Correction Slip No.104 to the Indian Railways Permanent Way manual
105 277(a)(3) 2004/CE-II/CS/ 1 Pt.1 22.08.2007 Advance Correction Slip No.105 to the Indian Railways Permanent Way manual
106 124(2)(a) 2006/CE-II/CS/1 14.09.2007 Advance Correction Slip No.106 to the Indian Railways Permanent Way manual
107 615(3) 2007/CE-II/CS/2 12.11.2007 Advance Correction Slip No.107 to the Indian Railways Permanent Way manual
108 1302(2)(h) 2003/CE-I/LX/59 18.12.2007 Advance Correction Slip No.108 to the Indian Railways Permanent Way manual
109 202(1) 2003/CE-II/TS/2 Pt.1   .02.2008 Advance Correction Slip No.109 to the Indian Railways Permanent Way manual
110 806(1), 806(2) 2007/CE-II/CS/2 04.03.2008 Advance Correction Slip No.110 to the Indian Railways Permanent Way manual
111 Paras 222, 701 (2), 1301 (1). 1302 (1), (1) (i), (2) (g), 1307 (1) (g), 1309 (1), 1309 (2), 1309 (4) and Annexures 13/1 (2), (4), (5) & Annexure 13/6 (heading)

-

23.04.2008 Advance Correction Slip No.111 to the Indian Railways Permanent Way manual
112 726(3) 2006/CE-II/CS/1 25.4.2008 Inspection of all RAW/RAT before the monsoon.
113 1504 2006/CE-II/CS/2 3.6.2008 Refresher courses.
114 206(3) and 317(3)(i) 2006/CE-II/CS 10.10.2008 Gang Chart/diary
115 904 & 924(b)(i) 2006/CE-II/CS/2 24.11.2008 Manning unmanned level crossings.
116 220 2008/CE-II/CS/4 23.04.2009 Trolley Refuges
117 322 2007/CE-II/CS/2 19.05.2009 Identification of different qualities of rails in the field.
118 146(vii) - 30.07.2009 Supervision of pre and post machine attention.
119 220(3) - 18.08.2009 Distance of trolley refuses on bridges.

 
2.

INDEX OF ADVANCE CORRECTION SLIPS OF INDIAN RAILWAYS TRACK MANUAL

ACS
No.
Para(s) affected File No. Date of AC slip

Brief subject.

37 701-E 2001/CE.I/CT/17(Pt) 04.03.2003 Ammendments to Para 701-E
38 1102-E 2001/CE.I/CT/17(Pt) 04.03.2003 Ammendments to Para 1102-E

 
3.

INDEX OF ADVANCE CORRECTION SLIPS OF INDIAN RAILWAYS TRACK MACHINES MANUAL

ACS
No.
Para(s) affected File No. Date of AC slip

Brief subject.

1 8.4.7 2000/Track-III/TK/18 10.10.2000 Ammendments to Para 8.4.7
2 Para (a) Chapter 8 of IRTMM 2000/Track-III/TK/18 11.07.2002 Ammendments to Para (a) Chapter 8 of IRTMM
3 4.6.8 Chapter 4 of IRTMM 2000/Track-III/TK/18 14.05.2003 Ammendments to Para 4.6.8 Chapter 4 of IRTMM
4 4.6.8 Chapter 4 of IRTMM 2000/Track-III/TK/18 14.05.2003 Ammendments to Para 4.6.8 Chapter 4 of IRTMM
5 5.6 2000/Track-III/TK/18 15.09.2003 Ammendments to Para 5.6
6 4.3.3 under para 4.3 of Chapter 4 of IRTMM 2000/Track-III/TK/18 13.01.2004 Ammendments to Para 4.3.3 under para 4.3 of Chapter 4 of IRTMM
7 4.3.1 under para 4.3 of Chapter 4 of IRTMM 2000/Track-III/TK/18 Ammendments to Para 4.3.3 under para 4.3 of Chapter 4 of IRTMM
8 5.1.3 under para 5.1 at Page 132 of Chapter 5 of IRTMM-2000  25.10.2004 New Paragraph No.5.1.3 is added under Para No.5.1 at page 132 of Chapter 5 of IRTM-2000

 
4.

INDEX OF ADVANCE CORRECTION SLIPS OF INDIAN RAILWAYS MANUAL FOR FLASH BUTT WELDING OF RAILS (1996)

ACS
No.
Para(s) affected File No. Date of AC slip

Brief subject.

7 Para 1.1, 5.5, 10.2.1, 10.2.2.1, 13 CT/JW/C 16.01.2007 Flash Butt Welding of Rails.

          
5.

INDEX OF ADVANCE CORRECTION SLIPS OF INDIAN RAILWAYS MANUAL FOR ULTRASONIC TESTING OF RAILS AND WELDS (1998)

ACS
No.
Para(s) affected File No. Date of AC slip

Brief subject.

14 Para 8.1 (vi)) Track/21/97/0908/7 10-9-1998 Defining size/shape of probes ( Para 8.1 (vi))
  * * *

Top